Double-storey extensions · Ripley

Double-storey extensions in Ripley

Double-storey extensions in Ripley from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Ripley

We work in Ripley (DE5) and the places around it, including Heanor, Belper and Alfreton.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What do you get with a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Measured survey, design and planning drawings
  • Householder planning application
  • Windows, insulation, plastering, electrics and plumbing

How much should I budget for a double-storey extension?

Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Planning and building rules in Ripley

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What should I think about before starting?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a double-storey extension in Ripley

Does a two-storey extension need planning permission?

Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

How do I get a price for double-storey extensions in Ripley?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about double-storey extensions, or see every project we cover in Ripley.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote