Double-storey extensions · The Scottish Borders

Double-storey extensions in the Scottish Borders

We design and build double-storey extensions throughout the Scottish Borders, with a fixed price in writing for the agreed specification and one point of contact.

Covering The Scottish Borders

Our coverage across the Scottish Borders includes Hawick, Galashiels, Peebles and Kelso.

Because the Scottish Borders covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the Scottish Borders

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What is included in a double-storey extension in the Scottish Borders?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Householder planning application
  • Foundations, steelwork, brick and block walls, roof
  • Windows, insulation, plastering, electrics and plumbing

What will a double-storey extension cost?

Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in Scotland?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Double-storey extensions: common questions

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Can you visit a house in the Scottish Borders to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about double-storey extensions, or see every project we cover in The Scottish Borders.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote