Covering Sevenoaks
Alongside Sevenoaks, we also cover Tonbridge, Swanley (9 miles to the north) and Tunbridge Wells.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What goes into a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Structural engineer’s design and calculations
- Windows, insulation, plastering, electrics and plumbing
- Joining the new first floor to the existing landing
How much does a double-storey extension cost in Sevenoaks?
Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
How is a double-storey extension approved in Sevenoaks?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What should I think about before starting?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The first-floor link can mean moving a bathroom or reshaping the landing.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Questions about a double-storey extension in Sevenoaks
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
Do you work in Sevenoaks?
Yes. Sevenoaks is within our coverage for double-storey extensions, along with nearby Tonbridge and Swanley.
Also covering
- Double-storey extensions in Tonbridge
- Double-storey extensions in Swanley
- Double-storey extensions in Tunbridge Wells
- Double-storey extensions in Bexley
Learn more about double-storey extensions, or see every project we cover in Sevenoaks.

