Double-storey extensions · Southend-on-Sea

Double-storey extensions in Southend-on-Sea

From the first site visit to the final building control sign-off, we manage double-storey extensions in Southend-on-Sea so you only have one company to deal with.

Covering Southend-on-Sea

We work in Southend-on-Sea (SS1, SS22, SS99) and the places around it, including Rayleigh, Canvey Island and South Benfleet.

Homes in the East of England

Across the East of England, newer estates often have integral garages and room for rear extensions, while older towns have Victorian terraces and conservation areas that shape what can be built.

What does a double-storey extension involve?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Measured survey, design and planning drawings
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

How much should I budget for a double-storey extension?

Indicative costs for double-storey extensions. London and the South East usually sit towards the top of each range.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

How is a double-storey extension approved in Southend-on-Sea?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What should Southend-on-Sea homeowners check first?

  • Neighbours’ light is assessed using the 45-degree guide many councils use.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a double-storey extension in Southend-on-Sea

Does a two-storey extension need planning permission?

Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Who deals with the council for a project in Southend-on-Sea?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about double-storey extensions, or see every project we cover in Southend-on-Sea.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote