Covering Wimbledon
We work in Wimbledon (SW19) and the places around it, including Morden, Mitcham and Putney.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What goes into a double-storey extension?
A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.
- Measured survey, design and planning drawings
- Structural engineer’s design and calculations
- Windows, insulation, plastering, electrics and plumbing
How much should I budget for a double-storey extension?
What double-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
How is a double-storey extension approved in Wimbledon?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission.
What can affect a double-storey extension?
- Neighbours’ light is assessed using the 45-degree guide many councils use.
- The first-floor link can mean moving a bathroom or reshaping the landing.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Double-storey extensions: common questions
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
How do I get a price for double-storey extensions in Wimbledon?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Double-storey extensions in Morden
- Double-storey extensions in Mitcham
- Double-storey extensions in Putney
- Double-storey extensions in New Malden
Learn more about double-storey extensions, or see every project we cover in Wimbledon.

