Covering Caerphilly
Our coverage around Caerphilly (CF83) also includes Whitchurch, Pontypridd and Cardiff.
Homes in Gwent
Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.
What is included in a garden annexe in Caerphilly?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Foundations and drainage connections
- Brick, block or timber-frame structure
- Kitchenette and shower room
What will a garden annexe cost?
Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Do you need permission for a garden annexe in Caerphilly?
Planning decisions in Wales are made by the local council, using permitted development rules set by the Welsh Government rather than England’s. Building regulations in Wales have their own approved documents, and the Party Wall etc. Act 1996 applies to work on shared walls and boundaries.
In Wales an annexe with sleeping accommodation needs planning permission, usually with a condition tying it to the main house.
What should I think about before starting?
- The annexe normally has to remain part of the main household, not let as a separate home.
- A level threshold and wider doors make the annexe suitable for later life.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Garden annexes: common questions
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you visit a house in Caerphilly to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Garden annexes in Whitchurch
- Garden annexes in Pontypridd
- Garden annexes in Cardiff
- Garden annexes in Newport
Learn more about garden annexes, or see every project we cover in Caerphilly.

