Garden annexes · Chester

Garden annexes in Chester

Garden annexes in Chester from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Chester

Alongside Chester, we also cover Hawarden (6 miles to the west), Deeside and Ellesmere Port.

Homes in the North West

The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.

What does a garden annexe involve?

A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.

  • Design and planning application
  • Foundations and drainage connections
  • Heating, hot water and electrics

What will a garden annexe cost?

Guide prices for garden annexes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

How is a garden annexe approved in Chester?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.

What should I think about before starting?

  • The annexe normally has to remain part of the main household, not let as a separate home.
  • Drainage may need a pump if the garden falls away from the sewer.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

How do I get a price for garden annexes in Chester?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about garden annexes, or see every project we cover in Chester.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote