Covering Dunbartonshire
Our coverage across Dunbartonshire includes Bearsden, Clydebank, Vale of Leven and Bishopbriggs.
Homes in Dunbartonshire
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What goes into a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Building warrant application and completion certificate
- Heating, hot water and electrics
- Accessible design options for older relatives
What is the guide price for a garden annexe in Dunbartonshire?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in Scotland?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What can change the price or programme?
- The annexe normally has to remain part of the main household, not let as a separate home.
- Drainage may need a pump if the garden falls away from the sewer.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about a garden annexe in Dunbartonshire
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you make it wheelchair accessible?
Yes. Level access, wider doors and a level-access shower can be designed in from the start.
Can you visit a house in Dunbartonshire to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Garden annexes in Bearsden
- Garden annexes in Clydebank
- Garden annexes in Vale of Leven
- Garden annexes in Bishopbriggs
Learn more about garden annexes, or see every project we cover in Dunbartonshire.

