Covering Forres
Our coverage around Forres (IV36) also includes Nairn, Elgin and Lossiemouth.
Because Moray covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in Moray
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Building warrant application and completion certificate
- Brick, block or timber-frame structure
- Accessible design options for older relatives
How much does a garden annexe cost in Forres?
Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Planning and building rules in Forres
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What should I think about before starting?
- The annexe normally has to remain part of the main household, not let as a separate home.
- Drainage may need a pump if the garden falls away from the sewer.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Garden annexes: common questions
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you make it wheelchair accessible?
Yes. Level access, wider doors and a level-access shower can be designed in from the start.
Can you visit a house in Forres to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- Garden annexes in Nairn
- Garden annexes in Elgin
- Garden annexes in Lossiemouth
- Garden annexes in Inverness
Learn more about garden annexes, or see every project we cover in Forres.

