Garden annexes · Forth Valley

Garden annexes in the Forth Valley

Looking for garden annexes in the Forth Valley? We take projects from the first visit to the final sign-off, and confirm the price in writing first.

Covering Forth Valley

Our coverage across the Forth Valley includes Stirling, Falkirk, Alloa and Grangemouth.

Homes in the Forth Valley

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What is a garden annexe?

We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.

  • Design and planning application
  • Brick, block or timber-frame structure
  • Accessible design options for older relatives

What is the guide price for a garden annexe in the Forth Valley?

Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

How is a garden annexe approved in the Forth Valley?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

In Scotland an annexe needs planning permission and a building warrant before work starts.

What should the Forth Valley homeowners check first?

  • The annexe normally has to remain part of the main household, not let as a separate home.
  • Council tax treatment depends on who lives there; check with your council.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

Who deals with the council for a project in the Forth Valley?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about garden annexes, or see every project we cover in Forth Valley.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote