Covering Galashiels
We work in Galashiels (TD1) and the places around it, including Selkirk, Hawick and Kelso.
Because the Scottish Borders covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the Scottish Borders
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What goes into a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Design and planning application
- Foundations and drainage connections
- Brick, block or timber-frame structure
How much should I budget for a garden annexe?
Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Do you need permission for a garden annexe in Galashiels?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What can change the price or programme?
- Drainage may need a pump if the garden falls away from the sewer.
- A level threshold and wider doors make the annexe suitable for later life.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
Can I rent the annexe out?
Usually not without a separate planning permission, because councils normally require it to stay part of the main house.
Do you work in Galashiels?
Yes. Galashiels is within our coverage for garden annexes, along with nearby Selkirk and Hawick.
Also covering
Learn more about garden annexes, or see every project we cover in Galashiels.