Garden annexes · Hexham

Garden annexes in Hexham

Our garden annexes service covers Hexham and the rest of Northumberland. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Hexham

Hexham is about 21 miles south-west of Morpeth. We also cover Consett (13 miles to the south-east), Newburn and Stanley.

Because Northumberland covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the North East

Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.

What do you get with a garden annexe?

A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.

  • Design and planning application
  • Foundations and drainage connections
  • Kitchenette and shower room

What is the guide price for a garden annexe in Hexham?

What garden annexes typically cost. These are guide ranges; the written quote for your house replaces them.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

How is a garden annexe approved in Hexham?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.

What should I think about before starting?

  • Drainage may need a pump if the garden falls away from the sewer.
  • A level threshold and wider doors make the annexe suitable for later life.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

Who deals with the council for a project in Hexham?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about garden annexes, or see every project we cover in Hexham.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote