Covering Irvine
We work in Irvine (KA12) and the places around it, including Kilwinning, Troon and Kilmarnock.
Homes in Ayrshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What goes into a garden annexe?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Brick, block or timber-frame structure
- Kitchenette and shower room
- Heating, hot water and electrics
What is the guide price for a garden annexe in Irvine?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in Scotland?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What should I think about before starting?
- Drainage may need a pump if the garden falls away from the sewer.
- A level threshold and wider doors make the annexe suitable for later life.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you visit a house in Irvine to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Garden annexes near Irvine
- Garden annexes in Kilwinning
- Garden annexes in Troon
- Garden annexes in Kilmarnock
- Garden annexes in Prestwick
Learn more about garden annexes, or see every project we cover in Irvine.

