Covering Northolt
Our coverage around Northolt (UB5) also includes Greenford, Harrow and Southall.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What do you get with a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Design and planning application
- Brick, block or timber-frame structure
- Kitchenette and shower room
How much does a garden annexe cost in Northolt?
Guide prices for garden annexes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Planning and building rules in Northolt
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
A self-contained annexe used for sleeping and living normally needs planning permission in England.
What should I think about before starting?
- The annexe normally has to remain part of the main household, not let as a separate home.
- A level threshold and wider doors make the annexe suitable for later life.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Garden annexes: common questions
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Who deals with the council for a project in Northolt?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Garden annexes in Greenford
- Garden annexes in Harrow
- Garden annexes in Southall
- Garden annexes in Brent
Learn more about garden annexes, or see every project we cover in Northolt.

