Covering Perth
Alongside Perth, we also cover Auchterarder (13 miles to the south-west), Kinross and Blairgowrie.
Homes in Perth and Kinross
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What goes into a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Building warrant application and completion certificate
- Kitchenette and shower room
- Heating, hot water and electrics
What is the guide price for a garden annexe in Perth?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Do you need permission for a garden annexe in Perth?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What should I think about before starting?
- Drainage may need a pump if the garden falls away from the sewer.
- Council tax treatment depends on who lives there; check with your council.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Can I rent the annexe out?
Usually not without a separate planning permission, because councils normally require it to stay part of the main house.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
How do I get a price for garden annexes in Perth?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Garden annexes in nearby towns
- Garden annexes in Auchterarder
- Garden annexes in Kinross
- Garden annexes in Blairgowrie
- Garden annexes in Crieff
Learn more about garden annexes, or see every project we cover in Perth.

