Covering Putney
Alongside Putney, we also cover Barnes, Fulham (2 miles to the north-east) and Wimbledon.
Homes in London
Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.
What do you get with a garden annexe?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Design and planning application
- Kitchenette and shower room
- Accessible design options for older relatives
What will a garden annexe cost?
Indicative costs for garden annexes. London and the South East usually sit towards the top of each range.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
How is a garden annexe approved in Putney?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.
What should Putney homeowners check first?
- A level threshold and wider doors make the annexe suitable for later life.
- Council tax treatment depends on who lives there; check with your council.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you make it wheelchair accessible?
Yes. Level access, wider doors and a level-access shower can be designed in from the start.
Who deals with the council for a project in Putney?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Garden annexes in nearby towns
- Garden annexes in Barnes
- Garden annexes in Fulham
- Garden annexes in Wimbledon
- Garden annexes in Chelsea
Learn more about garden annexes, or see every project we cover in Putney.

