Garden annexes · St Neots

Garden annexes in St Neots

We take on garden annexes in St Neots as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering St Neots

Our coverage around St Neots (PE19) also includes Huntingdon (9 miles to the north-east) and Bedford.

Homes in the East of England

Housing in the East of England ranges from post-war estates and modern developments to timber-framed and period homes in historic towns, so permitted development checks and conservation controls both feature regularly.

What does a garden annexe involve?

A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.

  • Brick, block or timber-frame structure
  • Heating, hot water and electrics
  • Accessible design options for older relatives

How much should I budget for a garden annexe?

Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

How is a garden annexe approved in St Neots?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England.

What should I think about before starting?

  • Drainage may need a pump if the garden falls away from the sewer.
  • Council tax treatment depends on who lives there; check with your council.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Garden annexes: common questions

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

How do I get a price for garden annexes in St Neots?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Garden annexes in nearby towns

Learn more about garden annexes, or see every project we cover in St Neots.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote