Garden annexes · Staveley

Garden annexes in Staveley

If you live in Staveley and want garden annexes, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Staveley

Staveley is about 24 miles north of Derby. We also cover Chesterfield (3 miles to the south-west), Dronfield and Sheffield.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What is included in a garden annexe in Staveley?

A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.

  • Design and planning application
  • Brick, block or timber-frame structure
  • Kitchenette and shower room

How much should I budget for a garden annexe?

Indicative costs for garden annexes. London and the South East usually sit towards the top of each range.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

What approvals does a garden annexe need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.

What should I think about before starting?

  • Drainage may need a pump if the garden falls away from the sewer.
  • A level threshold and wider doors make the annexe suitable for later life.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

Can you make it wheelchair accessible?

Yes. Level access, wider doors and a level-access shower can be designed in from the start.

Can you visit a house in Staveley to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about garden annexes, or see every project we cover in Staveley.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote