Covering Swindon
Alongside Swindon, we also cover Calne (13 miles to the south-west), Wantage and Chippenham.
Homes in the South West
In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.
What is a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Brick, block or timber-frame structure
- Kitchenette and shower room
- Accessible design options for older relatives
How much should I budget for a garden annexe?
What garden annexes typically cost. These are guide ranges; the written quote for your house replaces them.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Planning and building rules in Swindon
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A self-contained annexe used for sleeping and living normally needs planning permission in England.
What can affect a garden annexe?
- A level threshold and wider doors make the annexe suitable for later life.
- Council tax treatment depends on who lives there; check with your council.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Garden annexes: common questions
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Who deals with the council for a project in Swindon?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Garden annexes in nearby towns
- Garden annexes in Calne
- Garden annexes in Wantage
- Garden annexes in Chippenham
- Garden annexes in Devizes
Learn more about garden annexes, or see every project we cover in Swindon.

