Garden annexes · Witney

Garden annexes in Witney

We take on garden annexes in Witney as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Witney

We work in Witney (OX8, OX28, OX29) and the places around it, including Oxford, Abingdon and Wantage.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What is a garden annexe?

A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.

  • Brick, block or timber-frame structure
  • Kitchenette and shower room
  • Accessible design options for older relatives

What is the guide price for a garden annexe in Witney?

Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

What approvals does a garden annexe need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.

What should Witney homeowners check first?

  • Drainage may need a pump if the garden falls away from the sewer.
  • A level threshold and wider doors make the annexe suitable for later life.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

Do I need planning permission for a garden annexe?

Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

How do I get a price for garden annexes in Witney?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about garden annexes, or see every project we cover in Witney.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote