Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What goes into a house renovation?
A house renovation brings an older or neglected home up to modern standards: rewiring, new heating, replastering, new kitchen and bathrooms, windows, insulation and often a new layout. It can be done room by room or as one programme while the house is empty.
- Rewiring, heating and plumbing
- Insulation and energy upgrades
- Plastering, joinery, kitchen and bathrooms
How much should I budget for a house renovation?
Guide prices for house renovations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| House renovations | Guide price incl. VAT |
|---|---|
| Light refurbishment | £600 to £1,000 per m² |
| Full renovation | £1,000 to £1,800 per m² |
| Structural renovation and remodel | £1,800 to £2,800 per m² |
Planning and building rules in Blackheath
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.
What should I think about before starting?
- Older houses can hide timber decay and damp, so we allow a contingency.
- Living in during a full renovation is difficult; most people move out for part of it.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
House renovations: common questions
How long does a renovation take?
About 8 to 30 weeks on site depending on scope.
Do you handle the building control side?
Yes. We apply for and arrange inspections for everything that needs approval.
Who deals with the council for a project in Blackheath?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- House renovations in Greenwich
- House renovations in Catford
- House renovations in Eltham
- House renovations in Peckham
Learn more about house renovations, or see every project we cover in Blackheath.