House renovations in Highbury

House renovations for homes in Highbury and the surrounding parts of London, designed around your house and built by our teams under a single written contract.

Covering Highbury

Our coverage around Highbury (N5) also includes Islington, Holloway and Stamford Hill.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What goes into a house renovation?

We survey the house to find what really needs doing, from damp and roof condition to wiring age, then programme the work so the messy trades (structure, first-fix, plaster) happen before the finishing trades. A single contract avoids the gaps that appear when separate trades are booked independently.

  • Strip-out and structural repairs
  • Rewiring, heating and plumbing
  • Insulation and energy upgrades

What is the guide price for a house renovation in Highbury?

What house renovations typically cost. These are guide ranges; the written quote for your house replaces them.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

How is a house renovation approved in Highbury?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • Houses empty for two years or more can qualify for the reduced 5% VAT rate on renovation.
  • Living in during a full renovation is difficult; most people move out for part of it.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you handle the building control side?

Yes. We apply for and arrange inspections for everything that needs approval.

Can you visit a house in Highbury to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about house renovations, or see every project we cover in Highbury.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote