Covering Maesteg
We work in Maesteg (CF34) and the places around it, including Neath, Bridgend and Tonypandy.
Homes in Mid Glamorgan
Welsh homes include long terraces built into hillsides, stone cottages and modern estates, and sloping sites often shape how and where an extension can go.
What goes into a house renovation?
We survey the house to find what really needs doing, from damp and roof condition to wiring age, then programme the work so the messy trades (structure, first-fix, plaster) happen before the finishing trades. A single contract avoids the gaps that appear when separate trades are booked independently.
- Planning and building regulations checks under Welsh rules
- Condition survey and scope of works
- Insulation and energy upgrades
What will a house renovation cost?
Typical ranges for house renovations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| House renovations | Guide price incl. VAT |
|---|---|
| Light refurbishment | £600 to £1,000 per m² |
| Full renovation | £1,000 to £1,800 per m² |
| Structural renovation and remodel | £1,800 to £2,800 per m² |
Planning and building rules in Maesteg
Welsh projects need planning clearance from the council under Welsh rules, building regulations approval under the Welsh approved documents, and party wall notices where the work affects a neighbour’s wall or foundations.
Internal work like this does not usually need planning permission in Wales unless the building is listed. Building regulations approval is needed for the structural work.
What can change the price or programme?
- Older houses can hide timber decay and damp, so we allow a contingency.
- Energy upgrades are cheapest when walls and floors are already opened up.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does a renovation take?
About 8 to 30 weeks on site depending on scope.
Do you handle the building control side?
Yes. We apply for and arrange inspections for everything that needs approval.
Can you visit a house in Maesteg to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- House renovations in Neath
- House renovations in Bridgend
- House renovations in Tonypandy
- House renovations in Porthcawl
Learn more about house renovations, or see every project we cover in Maesteg.

