House renovations · Mansfield

House renovations in Mansfield

From the first site visit to the final building control sign-off, we manage house renovations in Mansfield so you only have one company to deal with.

Covering Mansfield

We work in Mansfield (NG18, NG70) and the places around it, including Sutton-in-Ashfield, Kirkby-in-Ashfield and Hucknall.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What goes into a house renovation?

A house renovation brings an older or neglected home up to modern standards: rewiring, new heating, replastering, new kitchen and bathrooms, windows, insulation and often a new layout. It can be done room by room or as one programme while the house is empty.

  • Strip-out and structural repairs
  • Plastering, joinery, kitchen and bathrooms
  • Decoration and flooring if required

What will a house renovation cost?

Use these ranges to budget for house renovations; the survey turns them into a fixed price for the agreed specification.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

How is a house renovation approved in Mansfield?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • Houses empty for two years or more can qualify for the reduced 5% VAT rate on renovation.
  • Living in during a full renovation is difficult; most people move out for part of it.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you handle the building control side?

Yes. We apply for and arrange inspections for everything that needs approval.

Who deals with the council for a project in Mansfield?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about house renovations, or see every project we cover in Mansfield.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote