House renovations · Warwick

House renovations in Warwick

Planning house renovations in Warwick? We design and build them for houses across Warwickshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Warwick

Alongside Warwick, we also cover Leamington Spa, Kenilworth (5 miles to the north) and Stratford-upon-Avon.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What is a house renovation?

We survey the house to find what really needs doing, from damp and roof condition to wiring age, then programme the work so the messy trades (structure, first-fix, plaster) happen before the finishing trades. A single contract avoids the gaps that appear when separate trades are booked independently.

  • Condition survey and scope of works
  • Strip-out and structural repairs
  • Rewiring, heating and plumbing

How much should I budget for a house renovation?

Indicative costs for house renovations. London and the South East usually sit towards the top of each range.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

Planning and building rules in Warwick

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.

What can change the price or programme?

  • Houses empty for two years or more can qualify for the reduced 5% VAT rate on renovation.
  • Energy upgrades are cheapest when walls and floors are already opened up.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Can we live in the house during a renovation?

For a light refurbishment, often yes. For a full or structural renovation, most people move out for at least part of the work.

Do you handle the building control side?

Yes. We apply for and arrange inspections for everything that needs approval.

Can you visit a house in Warwick to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about house renovations, or see every project we cover in Warwick.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote