House renovations · Wokingham

House renovations in Wokingham

House renovations for homes in Wokingham and the surrounding parts of Berkshire, designed around your house and built by our teams under a single written contract.

Covering Wokingham

We work in Wokingham (RG40) and the places around it, including Crowthorne, Bracknell and Camberley.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What is included in a house renovation in Wokingham?

We survey the house to find what really needs doing, from damp and roof condition to wiring age, then programme the work so the messy trades (structure, first-fix, plaster) happen before the finishing trades. A single contract avoids the gaps that appear when separate trades are booked independently.

  • Rewiring, heating and plumbing
  • Insulation and energy upgrades
  • Decoration and flooring if required

What will a house renovation cost?

Typical ranges for house renovations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

What approvals does a house renovation need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • Older houses can hide timber decay and damp, so we allow a contingency.
  • Energy upgrades are cheapest when walls and floors are already opened up.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

House renovations: common questions

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you handle the building control side?

Yes. We apply for and arrange inspections for everything that needs approval.

Can you visit a house in Wokingham to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about house renovations, or see every project we cover in Wokingham.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote