Covering Aston
Our coverage around Aston (B6) also includes Birmingham (1 miles to the south-west) and Smethwick.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What do you get with a house-to-flat conversion?
A house-to-flat conversion divides a single house into two or more self-contained flats, each with its own front door, kitchen and bathroom. It always needs planning permission and full building regulations approval, particularly for fire separation and sound insulation between flats.
- Fire separation and sound insulation between flats
- Separate electrics, heating and metering
- Kitchens, bathrooms and finishes
What is the guide price for a house-to-flat conversion in Aston?
Use these ranges to budget for house-to-flat conversions; the survey turns them into a fixed price for the agreed specification.
Priced on survey.
How is a house-to-flat conversion approved in Aston?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Dividing a house into flats always needs planning permission in England.
What should Aston homeowners check first?
- Some councils restrict the loss of family houses or limit flat conversions in certain streets.
- Each flat needs its own utilities and metering.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Does converting a house into flats need planning permission?
Yes, always. Subdividing a house into flats is development under planning law.
How long does a conversion take?
Typically 16 to 30 weeks on site after approvals.
Can you visit a house in Aston to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- House-to-flat conversions in Birmingham
- House-to-flat conversions in Smethwick
- House-to-flat conversions in Acocks Green
- House-to-flat conversions in West Bromwich
Learn more about house-to-flat conversions, or see every project we cover in Aston.

