House-to-flat conversions · Dungannon

House-to-flat conversions in Dungannon

House-to-flat conversions in Dungannon from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Dungannon

Dungannon is about 22 miles east of Omagh. We also cover Cookstown (10 miles to the north), Armagh and Portadown.

Homes in County Tyrone

Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.

What does a house-to-flat conversion involve?

We assess the house against the council’s policies on flat sizes, parking, bins and cycle storage before any design work, then design layouts to the space standards your council uses. On site the critical work is fire separation, sound insulation between floors, separate services and meters, and protected escape routes.

  • Feasibility check against local planning policy
  • Planning application and layouts to space standards
  • Separate electrics, heating and metering

How much should I budget for a house-to-flat conversion?

Typical ranges for house-to-flat conversions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Priced on survey.

Do you need permission for a house-to-flat conversion in Dungannon?

Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.

This needs full planning permission from the council in Northern Ireland, plus building control approval.

What can affect a house-to-flat conversion?

  • Each flat needs its own utilities and metering.
  • Sound insulation between flats is tested on completion.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

House-to-flat conversions: common questions

What are the main building regulations issues?

Fire separation between flats, protected escape routes, sound insulation and separate services.

How long does a conversion take?

Typically 16 to 30 weeks on site after approvals.

Do you work in Dungannon?

Yes. Dungannon is within our coverage for house-to-flat conversions, along with nearby Cookstown and Armagh.

House-to-flat conversions in nearby towns

Learn more about house-to-flat conversions, or see every project we cover in Dungannon.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote