Covering Gravesend
Gravesend is about 14 miles north-west of Maidstone. We also cover Grays (3 miles to the north-west), Strood and South Ockendon.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What is included in a house-to-flat conversion in Gravesend?
A house-to-flat conversion divides a single house into two or more self-contained flats, each with its own front door, kitchen and bathroom. It always needs planning permission and full building regulations approval, particularly for fire separation and sound insulation between flats.
- Feasibility check against local planning policy
- Separate electrics, heating and metering
- Bin, cycle and amenity space works
How much does a house-to-flat conversion cost in Gravesend?
What house-to-flat conversions typically cost. These are guide ranges; the written quote for your house replaces them.
Priced on survey.
What approvals does a house-to-flat conversion need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Dividing a house into flats always needs planning permission in England.
What should I think about before starting?
- Each flat needs its own utilities and metering.
- Sound insulation between flats is tested on completion.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
What are the main building regulations issues?
Fire separation between flats, protected escape routes, sound insulation and separate services.
How long does a conversion take?
Typically 16 to 30 weeks on site after approvals.
Do you work in Gravesend?
Yes. Gravesend is within our coverage for house-to-flat conversions, along with nearby Grays and Strood.
Other towns nearby
- House-to-flat conversions in Grays
- House-to-flat conversions in Strood
- House-to-flat conversions in South Ockendon
- House-to-flat conversions in Stanford-le-Hope
Learn more about house-to-flat conversions, or see every project we cover in Gravesend.

