Covering Basingstoke
We work in Basingstoke (RG21) and the places around it, including Fleet, Thatcham and Farnham.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What does kitchen installation involve?
Kitchen installation covers removing the old kitchen, preparing the room, fitting new units and worktops, connecting plumbing and appliances, and finishing with tiling and flooring. We supply kitchens or fit ones you have bought.
- Removal and disposal of the old kitchen
- Plumbing, electrics and gas alterations
- Splashback tiling and flooring
What is the guide price for kitchen installation in Basingstoke?
Indicative costs for kitchen installation. London and the South East usually sit towards the top of each range.
| Kitchen installation | Guide price incl. VAT |
|---|---|
| Fit only (your units) | £3,000 to £7,000 |
| Supply and fit, mid-range | £10,000 to £20,000 |
| Supply and fit, high-end | £20,000 to £40,000 |
How is kitchen installation approved in Basingstoke?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A new kitchen does not need planning permission. Some electrical work must be notified under building regulations, and gas work must be done by a Gas Safe registered engineer.
What should I think about before starting?
- Worktops in stone or quartz are templated after the units go in, adding a week or two.
- Extraction ducted outside works far better than recirculation.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Kitchen installation: common questions
How long does a kitchen installation take?
Usually 2 to 4 weeks including worktop templating.
Will I be without water?
Only briefly while the sink is connected; we keep downtime short.
Who deals with the council for a project in Basingstoke?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Kitchen installation in Fleet
- Kitchen installation in Thatcham
- Kitchen installation in Farnham
- Kitchen installation in Aldershot
Learn more about kitchen installation, or see every project we cover in Basingstoke.

