Covering Berkshire
We cover Berkshire, including Reading, Slough, Bracknell and Maidenhead, and the towns around them.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What goes into kitchen installation?
A good kitchen fit is mostly preparation: straight walls, level floors, services in the right place and an extraction route that works. Our teams handle the full sequence including electrics and gas connections by suitably registered engineers.
- Plastering and making good
- Units, worktops, sink and appliance fitting
- Splashback tiling and flooring
How much does kitchen installation cost in Berkshire?
Typical ranges for kitchen installation. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Kitchen installation | Guide price incl. VAT |
|---|---|
| Fit only (your units) | £3,000 to £7,000 |
| Supply and fit, mid-range | £10,000 to £20,000 |
| Supply and fit, high-end | £20,000 to £40,000 |
Planning and building rules in Berkshire
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
A new kitchen does not need planning permission.
What should Berkshire homeowners check first?
- Moving the sink may need a new waste route or pump.
- Extraction ducted outside works far better than recirculation.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
How long does a kitchen installation take?
Usually 2 to 4 weeks including worktop templating.
Do I need building regulations for a new kitchen?
Some electrical work and any structural changes must be approved or notified.
Who deals with the council for a project in Berkshire?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Kitchen installation in Reading
- Kitchen installation in Slough
- Kitchen installation in Bracknell
- Kitchen installation in Maidenhead
- Kitchen installation in Wokingham
- Kitchen installation in Newbury
- Kitchen installation in Windsor
- Kitchen installation in Crowthorne
- Kitchen installation in Thatcham
Learn more about kitchen installation, or see every project we cover in Berkshire.

