Covering Chelsea
Alongside Chelsea, we also cover Battersea, Fulham (1 miles to the west) and Notting Hill.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What does kitchen installation involve?
A good kitchen fit is mostly preparation: straight walls, level floors, services in the right place and an extraction route that works. Our teams handle the full sequence including electrics and gas connections by suitably registered engineers.
- Design and layout check
- Plumbing, electrics and gas alterations
- Plastering and making good
How much does kitchen installation cost in Chelsea?
Guide prices for kitchen installation, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Kitchen installation | Guide price incl. VAT |
|---|---|
| Fit only (your units) | £3,000 to £7,000 |
| Supply and fit, mid-range | £10,000 to £20,000 |
| Supply and fit, high-end | £20,000 to £40,000 |
What approvals does kitchen installation need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
A new kitchen does not need planning permission.
What can change the price or programme?
- Moving the sink may need a new waste route or pump.
- Induction hobs often need a dedicated circuit.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
How long does a kitchen installation take?
Usually 2 to 4 weeks including worktop templating.
Do I need building regulations for a new kitchen?
Some electrical work and any structural changes must be approved or notified.
Can you visit a house in Chelsea to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Kitchen installation in Battersea
- Kitchen installation in Fulham
- Kitchen installation in Notting Hill
- Kitchen installation in Shepherd's Bush
Learn more about kitchen installation, or see every project we cover in Chelsea.

