Covering Heston
Heston sits 11 miles west of London, with Hounslow 1 miles to the south-east and Isleworth 2 miles to the east.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What is kitchen installation?
Kitchen installation covers removing the old kitchen, preparing the room, fitting new units and worktops, connecting plumbing and appliances, and finishing with tiling and flooring. We supply kitchens or fit ones you have bought.
- Design and layout check
- Removal and disposal of the old kitchen
- Splashback tiling and flooring
What will kitchen installation cost?
Typical ranges for kitchen installation. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Kitchen installation | Guide price incl. VAT |
|---|---|
| Fit only (your units) | £3,000 to £7,000 |
| Supply and fit, mid-range | £10,000 to £20,000 |
| Supply and fit, high-end | £20,000 to £40,000 |
Do you need permission for kitchen installation in Heston?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
A new kitchen does not need planning permission.
What should Heston homeowners check first?
- Worktops in stone or quartz are templated after the units go in, adding a week or two.
- Moving the sink may need a new waste route or pump.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Kitchen installation: common questions
How long does a kitchen installation take?
Usually 2 to 4 weeks including worktop templating.
Do I need building regulations for a new kitchen?
Some electrical work and any structural changes must be approved or notified.
Can you visit a house in Heston to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Kitchen installation in Hounslow
- Kitchen installation in Isleworth
- Kitchen installation in Southall
- Kitchen installation in Hayes
Learn more about kitchen installation, or see every project we cover in Heston.

