Knock down and rebuild · Arnold

Knock down and rebuild in Arnold

If you live in Arnold and want knock down and rebuild, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Arnold

Arnold sits 3 miles north of Nottingham, with Nottingham 3 miles to the south and Hucknall 4 miles to the north-west.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What do you get with a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Reconnection of services and landscaping

How much does a knock down and rebuild cost in Arnold?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Planning and building rules in Arnold

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Knock down and rebuild: common questions

Do I need planning permission?

Yes, for the replacement dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Arnold?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Arnold.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote