Knock down and rebuild · Ayr

Knock down and rebuild in Ayr

If you live in Ayr and want knock down and rebuild, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Ayr

Ayr sits 12 miles south-west of Kilmarnock, with Prestwick 2 miles to the north-east and Troon 6 miles to the north.

Homes in Ayrshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What is a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Building warrant application and completion certificate
  • Asbestos survey, demolition notice and service disconnections
  • Reconnection of services and landscaping

How much should I budget for a knock down and rebuild?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Ayr?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

This needs planning permission and a building warrant from your council in Scotland before work starts.

What should Ayr homeowners check first?

  • You will need somewhere to live for most of a year.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

Do I need planning permission?

Yes, for the replacement dwelling.

Who deals with the council for a project in Ayr?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Ayr.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote