Covering Borehamwood
We work in Borehamwood (WD6) and the places around it, including Barnet, Bushey and Potters Bar.
Homes in the East of England
Across the East of England, newer estates often have integral garages and room for rear extensions, while older towns have Victorian terraces and conservation areas that shape what can be built.
What goes into a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Planning application for the replacement dwelling
- New foundations, structure and full fit-out
- Reconnection of services and landscaping
What is the guide price for a knock down and rebuild in Borehamwood?
What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can affect a knock down and rebuild?
- You will need somewhere to live for most of a year.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Do you work in Borehamwood?
Yes. Borehamwood is within our coverage for knock down and rebuild, along with nearby Barnet and Bushey.
Also covering
- Knock down and rebuild in Barnet
- Knock down and rebuild in Bushey
- Knock down and rebuild in Potters Bar
- Knock down and rebuild in Watford
Learn more about knock down and rebuild, or see every project we cover in Borehamwood.

