Knock down and rebuild · Camberley

Knock down and rebuild in Camberley

Our knock down and rebuild service covers Camberley and the rest of Surrey. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Camberley

Our coverage around Camberley (GU15) also includes Farnborough (3 miles to the south) and Crowthorne.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What goes into a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Camberley?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should Camberley homeowners check first?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Knock down and rebuild: common questions

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

Can you visit a house in Camberley to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Camberley.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote