Corby sits 19 miles north-east of Northampton, with Uppingham 6 miles to the north and Kettering 7 miles to the south.
Homes in the East Midlands
The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.
What do you get with a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Feasibility: rebuild versus extend and renovate
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
How much should I budget for a knock down and rebuild?
What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in Corby?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What should Corby homeowners check first?
- You will need somewhere to live for most of a year.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Corby?
Yes. Corby is within our coverage for knock down and rebuild, along with nearby Uppingham and Kettering.
Also covering
- Knock down and rebuild in Uppingham
- Knock down and rebuild in Kettering
- Knock down and rebuild in Market Harborough
- Knock down and rebuild in Oakham
Learn more about knock down and rebuild, or see every project we cover in Corby.