Knock down and rebuild · Craigavon

Knock down and rebuild in Craigavon

Knock down and rebuild in Craigavon from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Craigavon

Craigavon sits 13 miles north-east of Armagh, with Portadown 3 miles to the south-west and Banbridge 8 miles to the south-east.

Homes in County Armagh

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What do you get with a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Planning and building control applications to the council
  • New foundations, structure and full fit-out
  • Reconnection of services and landscaping

How much should I budget for a knock down and rebuild?

What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Craigavon?

Northern Ireland projects need planning clearance and building control approval from the local council. We prepare the applications and agree any work near neighbouring property directly with the neighbours.

This needs full planning permission from the council in Northern Ireland, plus building control approval.

What can change the price or programme?

  • You will need somewhere to live for most of a year.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Do you work in Craigavon?

Yes. Craigavon is within our coverage for knock down and rebuild, along with nearby Portadown and Banbridge.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Craigavon.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote