Covering Dalkeith
Alongside Dalkeith, we also cover Bonnyrigg, Musselburgh (3 miles to the north) and Haddington.
Homes in the Lothians
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What is included in a knock down and rebuild in Dalkeith?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Feasibility: rebuild versus extend and renovate
- Asbestos survey, demolition notice and service disconnections
- New foundations, structure and full fit-out
How much should I budget for a knock down and rebuild?
Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in Dalkeith?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What should I think about before starting?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Dalkeith?
Yes. Dalkeith is within our coverage for knock down and rebuild, along with nearby Bonnyrigg and Musselburgh.
Other towns nearby
- Knock down and rebuild in Bonnyrigg
- Knock down and rebuild in Musselburgh
- Knock down and rebuild in Haddington
- Knock down and rebuild in Kirkcaldy
Learn more about knock down and rebuild, or see every project we cover in Dalkeith.

