Knock down and rebuild · Dumfries

Knock down and rebuild in Dumfries

Homeowners in Dumfries can get knock down and rebuild from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Dumfries

Our coverage around Dumfries (DG1) also includes Dalbeattie, Annan and Carlisle.

Projects in Dumfries and Galloway are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.

Homes in Dumfries and Galloway

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What is a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Building warrant application and completion certificate
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

How much should I budget for a knock down and rebuild?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in Scotland?

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

This needs planning permission and a building warrant from your council in Scotland before work starts.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Dumfries?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Dumfries.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote