Covering Hornsea
We work in Hornsea (HU18) and the places around it, including Beverley, Bridlington and Driffield.
Homes in Yorkshire and the Humber
Across Yorkshire and the Humber, older stone and brick terraces sit alongside inter-war semis and newer estates, and dormers and rear extensions are designed to suit each.
What is a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Reconnection of services and landscaping
How much should I budget for a knock down and rebuild?
Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can change the price or programme?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Do I need planning permission?
Yes, for the replacement dwelling.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Can you visit a house in Hornsea to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Knock down and rebuild near Hornsea
- Knock down and rebuild in Beverley
- Knock down and rebuild in Bridlington
- Knock down and rebuild in Driffield
- Knock down and rebuild in Hull
Learn more about knock down and rebuild, or see every project we cover in Hornsea.

