Covering Isle of Wight
Our knock down and rebuild service in the Isle of Wight covers Newport, Ryde, Cowes and Sandown.
Projects in the Isle of Wight are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What do you get with a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Feasibility: rebuild versus extend and renovate
- New foundations, structure and full fit-out
- Reconnection of services and landscaping
What will a knock down and rebuild cost?
Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in the Isle of Wight?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should the Isle of Wight homeowners check first?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- You will need somewhere to live for most of a year.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in the Isle of Wight?
Yes. the Isle of Wight is within our coverage for knock down and rebuild, along with nearby Newport and Ryde.
Also covering
- Knock down and rebuild in Newport
- Knock down and rebuild in Ryde
- Knock down and rebuild in Cowes
- Knock down and rebuild in Sandown
Learn more about knock down and rebuild, or see every project we cover in Isle of Wight.