We work in Launceston (PL15) and the places around it, including Bude, Bodmin and Plymouth.
Because Cornwall covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the South West
In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.
What is a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
- Reconnection of services and landscaping
What will a knock down and rebuild cost?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can change the price or programme?
- You will need somewhere to live for most of a year.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Do you work in Launceston?
Yes. Launceston is within our coverage for knock down and rebuild, along with nearby Bude and Bodmin.
Also covering
- Knock down and rebuild in Bude
- Knock down and rebuild in Bodmin
- Knock down and rebuild in Plymouth
- Knock down and rebuild in Bideford
Learn more about knock down and rebuild, or see every project we cover in Launceston.