Knock down and rebuild · Llanelli

Knock down and rebuild in Llanelli

Knock down and rebuild in Llanelli from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Llanelli

Our coverage around Llanelli (SA15) also includes Pontarddulais (6 miles to the north-east) and Swansea.

Homes in Dyfed

Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.

What goes into a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • New foundations, structure and full fit-out
  • Reconnection of services and landscaping

How much should I budget for a knock down and rebuild?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Llanelli?

Planning decisions in Wales are made by the local council, using permitted development rules set by the Welsh Government rather than England’s. Building regulations in Wales have their own approved documents, and the Party Wall etc. Act 1996 applies to work on shared walls and boundaries.

This needs full planning permission from your council in Wales.

What should Llanelli homeowners check first?

  • Planning policy on replacement dwellings varies, especially in green belt and countryside.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Llanelli?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Llanelli.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote