Covering Morpeth
Alongside Morpeth, we also cover Bedlington (5 miles to the south-east), Ashington and Cramlington.
Because Northumberland covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the North East
Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.
What do you get with a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
How much should I budget for a knock down and rebuild?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should Morpeth homeowners check first?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
How do I get a price for knock down and rebuild in Morpeth?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Knock down and rebuild in Bedlington
- Knock down and rebuild in Ashington
- Knock down and rebuild in Cramlington
- Knock down and rebuild in Blyth
Learn more about knock down and rebuild, or see every project we cover in Morpeth.