Covering Newburn
Our coverage around Newburn (NE15) also includes Gosforth (5 miles to the east) and Newcastle upon Tyne.
Homes in the North East
Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.
What is a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
- Reconnection of services and landscaping
What will a knock down and rebuild cost?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council.
What can change the price or programme?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Is it cheaper to knock down and rebuild or renovate?
It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How do I get a price for knock down and rebuild in Newburn?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Gosforth
- Knock down and rebuild in Newcastle upon Tyne
- Knock down and rebuild in Gateshead
- Knock down and rebuild in Felling
Learn more about knock down and rebuild, or see every project we cover in Newburn.

