Covering Newry
Alongside Newry, we also cover Banbridge, Keady (15 miles to the west) and Portadown.
Homes in County Down
Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.
What do you get with a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning and building control applications to the council
- New foundations, structure and full fit-out
- Reconnection of services and landscaping
How much should I budget for a knock down and rebuild?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Planning and building rules in Newry
In Northern Ireland the council handles both planning and building control. Permitted development rules are set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and there is no party wall act, so we agree access and protection with neighbours in writing.
This needs full planning permission from the council in Northern Ireland, plus building control approval.
What should I think about before starting?
- You will need somewhere to live for most of a year.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
Do I need planning permission?
Yes, for the replacement dwelling.
Can you visit a house in Newry to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Banbridge
- Knock down and rebuild in Keady
- Knock down and rebuild in Portadown
- Knock down and rebuild in Armagh
Learn more about knock down and rebuild, or see every project we cover in Newry.

