Knock down and rebuild in Newtownabbey

Knock down and rebuild in Newtownabbey from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Newtownabbey

Our coverage around Newtownabbey (BT36, BT37) also includes Holywood, Belfast and Carrickfergus.

Homes in County Antrim

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What is included in a knock down and rebuild in Newtownabbey?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Planning and building control applications to the council
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

How much should I budget for a knock down and rebuild?

What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in Northern Ireland?

Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.

This needs full planning permission from the council in Northern Ireland, plus building control approval.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Newtownabbey?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Newtownabbey.