Covering Oxford
Our coverage around Oxford (OX1) also includes Abingdon, Didcot and Witney.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What is a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Feasibility: rebuild versus extend and renovate
- Planning application for the replacement dwelling
- Demolition and site clearance
What will a knock down and rebuild cost?
Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
What approvals does a knock down and rebuild need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can change the price or programme?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Questions about a knock down and rebuild in Oxford
How long does it take?
Around 36 to 60 weeks including demolition.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Can you visit a house in Oxford to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Abingdon
- Knock down and rebuild in Didcot
- Knock down and rebuild in Witney
- Knock down and rebuild in Bicester
Learn more about knock down and rebuild, or see every project we cover in Oxford.

